paulimot builds

Due to the strong growth of paulimot in recent years, our headquarters at Zeppelinstraße 3 has become too small. After acquiring the neighbouring property at Zeppelinstrasse 5/3 with an existing building in March 2019 and the neighbouring property at Zeppelinstrasse 7 with two other existing buildings in July 2020, we are currently undergoing extensive construction and renovation work.

A spacious new building is currently being realised to connect the buildings at Zeppelinstrasse 3 and Zeppelinstrasse 5/3, as well as extensive conversion and extension work in the existing buildings at Zeppelinstrasse 3 and 5/3. Following the departure of the current tenant from the buildings at Zeppelinstrasse 7, conversion work will also be carried out in these properties and a structural connection to Zeppelinstrasse 5/3 will be created.

After renovation work had already been carried out in the existing building at Zeppelinstrasse 5/3 since the second half of 2019, an important milestone was reached on 14 September 2020 after one and a half years of planning: The construction company arrived and started work on our new building. On this page, we will keep you up to date with pictures and current information on our entire new building and extension project.

Dark construction site thumbnail with red lettering "paulimot baut - Zeitraffer", white date "14.09.2020 - 12.10.2021" and red play button.

Project schedule

  • Since January 2019
  • Planning of the overall project and in particular the new building
  • May 2019 until January 2020
  • Renovation of the upper floor (offices) of the existing building Zeppelinstraße 5/3
  • September 2020 until the beginning of 2022
  • Construction and interior fit-out of the new building
  • Mid 2021 until spring 2022
  • Conversion of the ground floor of Zeppelinstraße 5/3 into a reception and meeting area
A 3D sketch of a building complex with red roofs and white walls. The buildings are arranged at an angle and connected by corridors. Shadows indicate a light source from the top right.
  • Beginning of 2022 to mid-2022
  • Remodelling of the existing building at Zeppelinstraße 3, installation of additional office space
  • Spring and summer 2022
  • Construction of a connecting corridor to Zeppelinstraße 7 and redesign of the outdoor facilities
  • From spring 2022
  • Comprehensive reorganisation of the technology and logistics divisions
  • From autumn 2022
  • Remodelling work in the buildings at Zeppelinstraße 7
Four people at the ground-breaking ceremony in front of an excavator. Men in shirts and jeans, women in blouses and jeans. They are holding spades and smiling at the camera. Mounds of earth and construction machinery in the background.
People with spades in front of a mound of earth and a lorry in the background. One person throws earth into the air.
Ground-breaking ceremony

Image 1: The Paulitschek family at the ground-breaking ceremony for the new building (17 September 2020).

Image 2: The ground-breaking ceremony marks the next milestone for the new building (17 September 2020).

Overview of a building site with construction vehicles, a yellow house with an open ground floor and dense vegetation in the foreground behind a fence.
An orange excavator stands on a building site in front of two multi-storey buildings, digging up earth and carrying out construction work. A few vehicles are parked in the background.
Excavation pit with excavator loading earth into a lorry. In the background a yellow building with a construction fence.
A construction pit with excavator, lorry and mini excavator. In the background are yellow buildings, a construction worker in orange stands at the edge of the pit.
A construction site with a crane lifting a tower segment in order to mount it on an already standing tower section. A worker can be seen on the tower.
A tall construction crane stands between residential buildings on a building site. Building materials and a construction container can be seen in the foreground. The sky is bright.
Excavation pit and construction crane

Image 1: View from Zeppelinstraße 3 towards Zeppelinstraße 5/3 of the construction site for the future connecting building (11 September 2020).

Image 2: The construction site is cleared in preparation for the excavation work (15 September 2020)

Image 3: The excavation work has begun (18 September 2020)

Image 4: The excavation pit is almost completely excavated (23 September 2020)

Image 5: The construction crane is being erected... (30 September 2020)

Image 6: ... and towers above the existing buildings on the same evening (30 September 2020).

Excavation pit with foundation preparation and red formwork. In the background, a yellow building whose façade is partially covered with wooden panels. Two workers are standing on scaffolding.
A construction site with red steel reinforcement and timber formwork. In the background a grey building with windows and containers. The sky is bright.
Construction site with buildings in the background. Trenches and construction pits with steel reinforcements and formwork can be seen in the foreground. Building materials are ready.
Basement walls

Image 1: Things are now progressing quickly: the first basement walls have been concreted and a connection to the existing building at Zeppelinstrasse 5/3 is being created in the basement (12 November 2020).

Image 2: The existing building at Zeppelinstrasse 3 from a perspective we have not seen before (12 November 2020).

Image 3: Almost all the basement walls are finished, the stairwell and lift shaft are visible (18 November 2020).

Construction work: Concrete work for basements in a residential area with containers, materials and construction equipment on a concreted area. Tarpaulins cover the earth.
Cellar ceiling in the shell with supports, ladders, material and a tarpaulin. The ceiling is concreted, but not yet finished.
Construction site with shell of a basement ceiling made of steel reinforcement, surrounded by yellow buildings and an excavation pit with ladder.
Construction site at dusk: concrete mixers and cranes pump concrete onto a prepared surface, workers monitor the process. Illuminated buildings in the background.
Construction site with smooth concrete surface. Workers with smoothing machines work on the floor. In the background, buildings under a blue sky.
Basement ceiling

Image 1: The formwork for the basement ceiling is being erected (24 November 2020)

Image 2: A forest of columns spreads out in the basement (27 November 2020).

Image 3: The slab formwork is fully erected and the reinforcement work is almost complete (14 December 2020)

Image 4: Concreting work on the basement ceiling begins in the early morning darkness... (16 December 2020).

Image 5: ... and continue smoothing into the next night (16 December 2020).

Construction site with red formwork for concrete work and tools. A house is in the background. The sky is grey.
A building site next to a yellow house. Scaffolding stands in front of a dark area with a wooden frame. Tools and building materials are lying around.
Overview of an outdoor construction site with scaffolding, building materials and concrete structures in front of residential buildings. The sky is cloudy.
Construction site with unfinished concrete walls, scaffolding and building materials. A construction crane is visible in the background.
Ground floor

Image 1: After a long winter break due to the weather, work continues on the ground floor walls (5 February 2021).

Image 2: View from the east with connection to the existing building at Zeppelinstraße 5/3 (17 February 2021).

Image 3: The walls for the ground floor are rising (17 February 2021).

Image 4: Colourful mix of concrete and bricks (24 February 2021).

Interior shot of a building site. Metal supports hold up a green ceiling construction. Ladders and building materials can be seen in the background.
Construction site with tools and building materials under a blue sky. There are buildings in the background.
Construction site with scaffolding, steel reinforcement, building materials and a yellow building in the background under a cloudy sky.
Construction site: Workers spread concrete on a grid of reinforcing steel, with concrete pumps and buildings in the background. A vibrating plate is in the foreground.
Ceiling above ground floor

Image 1: The formwork for the ceiling above the ground floor is being erected... (26 February 2021)

Image 2: ... and once again allows new insights and views (1 March 2021).

Image 3: The reinforcement work is progressing (3 March 2021)

Image 4: The ceiling above the ground floor is concreted (8 March 2021).

A building site with scaffolding in front of a two-storey building. Bricks and building materials are visible. The sky is cloudy.
Outdoor construction work with scaffolding, concrete wall, bricks, building materials and tools. A building is visible in the background. The sky is cloudy.
Outdoor construction site with concrete pillars, scaffolding and a container filled with building rubble. Buildings and light snowfall are visible in the background.
Building site: brickwork with openings, piles of wood, building accessories. In the background a house under a cloudy sky.
Construction: Staircase shell with concrete steps, wooden scaffolding and brick wall.
Upper floor

Image 1: The scaffolding and the first walls are going up (10 March 2021).

Image 2: The walls for the connection to the Zeppelinstraße 3 building are being built (17 March 2021).

Image 3: Concrete columns in the snow flurry (19 March 2021).

Image 4: The windows of the future offices are already clearly visible (with a little imagination) (22 March 2021)

Image 5: Every new floor also needs a staircase (29 March 2021).

Interior shot of a construction site with supports and beams for a ceiling. Further scaffolding and materials can be seen in the background.
Construction view from above: Building shell with scaffolding, steel reinforcement on the ceiling and brickwork. A ladder in the foreground.
Building site with crane and concrete pump. Brick building in the shell, workers on the roof, grey sky.
Construction site: Steel grid lies on a formwork. A concrete mixer pumps concrete onto the surface. Workers spread the concrete. Buildings and blue sky in the background.
Construction site with containers, tools, formwork and a circular table saw on a concrete surface under a cloudy sky.
Ceiling above upper floor

Image 1: The formwork for the ceiling above the upper floor - which is also the building roof - is being erected (24 March 2021).

Image 2: The reinforcement for the building roof is in place (7 April 2021).

Image 3: Heavy equipment moves in one last time for concreting the ceiling above the upper floor (7 April 2021).

Image 4: Even the top of Ulm Minster can be seen from the roof (7 April 2021)

Image 5: The roof is topped off with a parapet (12 April 2021).

Interior being remodelled with two people. One person is walking, one person is working. Debris and tools are lying around. Walls are partially demolished and ceilings are open.
Shell of a room with installations. Metal frame, pipes and boxes on the wall. A ladder is on the left in the room.
Interior view of a building shell with wooden panels and metal struts. There are blue plasterboard panels in the room. Pipes and insulation material hang from the ceiling. A person can be seen in the background.
Interior of a building site. The floor is covered with black studded foil. Walls partly unfinished, partly panelled with wood. Another room with foil in the background.
An empty room with a new screed floor. Two brick packs are on the floor. Window and red marking on the wall. Taped edges.
Renovation of Zeppelinstraße 5/3 (part 1)

Image 1: The installation of a reception and meeting area in the Zeppelinstraße 5/3 building begins with demolition work (26 March 2021).

Image 2: The first partition walls are bricked and the installation work for the new sanitary area begins (16 April 2021)

Image 3: Drywall construction is progressing (21 April 2021).

Image 4: The installation of the underfloor heating is being prepared... (30 April 2021)

Image 5: ... and a few weeks later the screed is installed (26 May 2021).

Image of a light grey flat roof with several openings, low walls and structures. Buildings and trees are visible in the background under a blue sky. A white note with the number 1 is at the bottom.
Wet, grey roof with rectangular fields that shrink in perspective. In the background scaffolding, buildings and trees under a cloudy sky. A "2" at the bottom right.
Interior shot of a building shell with construction site equipment, unplastered walls and large windows that let in daylight. A tripod stands in the room.
Shell construction with concrete floor and ceiling, large window front provides a view of a street and buildings. Sunlight falls through the windows. A white "4" can be seen in the bottom right-hand corner.
Flat roof with bitumen sheeting and roof structures, with buildings and construction cranes in the background under a cloudy sky.
New build: Roof waterproofing and windows

Image 1: The roof is waiting for the roofer (9 May 2021).

Image 2: The first layer of bitumen sheeting is laid and welded (21 May 2021).

Image 3: The window fitters begin installing the windows and glass façade at the same time as the roofers (31 May 2021).

Image 4: The façade takes shape... (2 June 2021)

Image 5: ... and the roof has now received the sloping insulation and a further bitumen sealing layer (9 June 2021).

Interior in shell construction with brick walls, concrete floor and ceiling with skylight. Building materials such as plasterboard, wooden panels and metal profiles are stored in the room.
Shell construction shows metal stud frame, partly clad with wooden panels, insulation material, windows and doors. The floor is rough, the room is empty.
Interior view of a construction site: metal profiles with plasterboard, installation of toilet cubicles and various fixtures.
Interior in the shell with visible wooden panels, metal profiles and insulation material on the walls. A room with cables on the floor and windows in the background.
New building: Interior work (part 1)

Image 1: Interior work also begins in the new building (14 June 2021).

Image 2: The first drywall walls can be seen on the upper floor - the future office floor (16 June 2021).

Image 3: A new sanitary area is also being built in the new building (18 June 2021)

Image 4: The corridor and future offices are now clearly distinguishable (21 June 2021).

Close-up of a building site with scaffolding on a grey wall. Metal fence, gravel and green plants can be seen in the foreground. A large white building is visible in the background.
A house facade is covered with scaffolding, prepared for plastering work, in front of a building under a blue sky.
Interior of a building site. The walls are roughly plastered. A window with scaffolding in front of it, tools in the room and an orange-coloured pipe lying on the floor.
New building: Plastering work

Image 1: At the same time as the interior work on the upper floor began, the plasterers started work on the exterior walls on the south and west façades... (25 June 2021)

Image 2: ... and on the north side of the new building (28 June 2021).

Image 3: The future storage and assembly area on the ground floor receives the first layer of lime-cement plaster (2 July 2021)

Shell of a room with underfloor heating and plastered walls. There are dark heating panels on the floor, partially covered with protective film. Wooden panels are attached to one wall.
A room with underfloor heating in a red pipe system on a black background. Window front covered with foil. A blue bucket stands in the room.
Room in the shell: ceiling with grid panels and long fluorescent tubes, plaster partially applied. Doorway in the background, green plastic crates stacked in front of it.
An empty room with a grey concrete floor and white walls. Pipes and cable trays are attached to the ceiling. There are green boxes and building materials in the room.
An empty room with a concrete floor and white walls. Pipes and cable ducts run along the ceiling. Stacked cardboard boxes can be seen at the end of the room.
New building: Technical building services (part 1)

Image 1: Insulation and dimpled sheets are installed in the future office and meeting rooms on the upper floor, ... (7 July 2021)

Image 2: ... on which the heating loops for the underfloor heating will then be laid (19 July 2021)

Image 3: Installation of the heating system also begins in the future assembly hall (23 July 2021)

Image 4: More and more cable and installation routes are visible under the ceilings (9 August 2021).

Image 5: After the tradesmen's holidays, the technical installations on the ground floor and basement are largely complete (29 September 2021).

A room in the shell. The walls are plastered, the floor is poured. Five blue, square covers are spread around the room. Protective film is attached to the window.
View into a concrete shaft with a red metal structure. Two red supports flank the shaft, connected by cross beams. Ladders are on the side walls. Tools are lying on the floor.
Interior view of a room in the shell with grey-painted walls and concrete floor. A lift with beige doors is located in the wall. Scaffolding on the right.
New building: Interior work (part 2)

Image 1: The screed is installed on the upper floor (26 July 2021)

Image 2: Installation of the lift begins... (12 October 2021)

Image 3: ... and is completed a few days later (15 October 2021).

A yellow, two-storey building with a red garage, connected by a grey extension. There is scaffolding in front of the building. Building materials are lying around, a lorry is partially visible in the picture.
A construction fence stands in front of a new building with scaffolding, next to a courtyard with paving stones. A grey wall closes off the courtyard. A tree grows behind the fence. Red roller shutters can be seen in the background.
Exterior view of a balcony with glass balustrade. Scaffolding in the background. The floor is wet and reflects the sky. Number 3 in the foreground.
Grey building view with windows, downpipe and fence in the foreground. The sky is cloudy.
Construction site with excavator and excavation pit next to a building with a grey façade. A site fence secures the area. Gravel covers the ground.
Further exterior views

Image 1: View of the new and existing buildings at Zeppelinstrasse 5/3 from the east (9 August 2021).

Image 2: The north façade is slowly revealing its final appearance (20 October 2021)

Image 3: The balcony on the north side is only missing the floor covering (3 November 2021)

Image 4: For the first time, the new building appears without scaffolding - here the west and part of the south façade (8 November 2021)

Image 5: The infiltration trench for rainwater is installed (12 November 2021).

Interior in the shell with exposed pipes and cables on the ceiling. Walls are partly plastered, floor is empty. Pipes are insulated, cables are hanging loose.
Interior of a building shell with visible installations on the ceiling, such as air conditioning and pipes, stored insulation material and ladders on the floor.
View of a shell construction room with exposed cables on the ceiling and walls. Light-coloured walls, partly clad with wood. There are more cables on the floor.
New building: Technical building equipment (part 2)

Image 1: The technical installations on the upper floor are progressing (15 October 2021).

Image 2: The cooling and ventilation systems are largely installed (15 October 2021)

Image 3: The electrical engineering is also making progress - although there is obviously still some work to be done here (15 October 2021).

An interior in the shell with a ceiling construction made of metal profiles and concrete slabs. Large window fronts with half-closed blinds provide a view to the outside. A ladder in the foreground.
Interior view of a building shell with visible ceiling construction, partially clad with perforated panels. Two ladders stand in the room in front of large windows.
Interior shot of a room in the shell. Dark grey tiles lie on the floor. A yellow spirit level lies on the left edge of the picture. The room is light in colour, the walls are still unfinished.
A hallway under renovation. Floor littered with broken tiles. Walls unfinished, door and fire protection equipment visible.
Interior shot of a room in the shell with unplastered walls. Cables hang from the ceiling. Aluminium frames with glass inserts separate the room. Tools lie on the floor.
New building: Interior fit-out (part 3)

Image 1: Installation of the suspended ceilings begins in the first offices (29 October 2021).

Image 2: The first acoustic ceilings are installed (8 November 2021)

Image 3: The tiler has started work in the corridors on the upper floor (19 November 2021)

Image 4: The old tiles in the existing building at Zeppelinstraße 5/3 have to make way for a uniform look in future (24 November 2021).

Image 5: Installation of the interior glass systems has begun (26 November 2021).

Interior in the shell with plasterboard ceiling, holes for spotlights and plastered walls. Doors and a ladder are recognisable.
A room under renovation with a grey wall, white wall, doorway, tool table and painting utensils. A jacket hangs on a ladder.
Shell construction: Room with perforated ceiling, exposed areas, unfinished floor and covered materials.
An interior with grey carpet, white walls and ceiling lights. There are two ladders in the room, one made of wood and one made of metal. A window can also be seen.
An office space with several desks and office chairs. The walls are white and there is incident light. The floor is carpeted. Packed documents lie on the tables.
New building: Interior work (part 4)

Image 1: Drywall construction is progressing in the corridors (3 December 2021).

Image 2: White paint and wallpaper make the ceilings and walls really stand out (6 December 2021)

Image 3: The drywall construction and painting work has been completed in the first offices (8 December 2021)

Image 4: The carpet and lights make it look much cosier (15 December 2021).

Image 5: The furniture finally completes the picture (17 December 2021).

Facts about the new building

1,700 m²New warehouse space
750 m²New office space
2,800 m²Total warehouse space after conversion
1,100 m²Total office space after conversion
Approx. 1,850 m²Removal of soil and gravel
approx. 1,800 m²use of concrete
approx. 65,000 kguse of steel
57New office workplaces
100,000New grey hairs since start of construction
76Total office workplaces after remodelling

We thank our partners for the trustful co-operation...

Planning
Architecture Dipl.-Ing. (FH) Raimund Stolz, Lonsee-Luizhausen
Structural engineering Engineering office Hausmann and Walk, Ulm
Structural analysis LGA Landesgewerbeanstalt Bayern Corporation under public law, Augsburg
TGA planning INUTEC Engineering & Management GmbH, Ulm
Interior design Dipl.-Ing. (FH) Gabriele Ziegler, Wolfertschwenden
Fire protection Dr Kathrin Grewolls, Ulm
Health and safety coordinator Dipl.-Ing. (FH) Beate Jansen, Neu-Ulm
Surveying Dipl.-Ing. (FH) Arnfried Wollschlaeger, Lonsee
Drainage planning Deißler engineering office, Dornstadt
Geotechnics Schirmer Ingenieurgesellschaft mbH, Ulm
Building physics Dipl.-Bauingenieur (FH) Paul Betz, Griesingen

Building envelope and outdoor facilities
Earthworks and structural work Christoph Haide GmbH & Co KG, Langenau
Waterproofing work Roland Wolf GmbH, Erbach
Building drying TROWA Wallisch GmbH, Langenau
Roofing work Dittmar GmbH, Neu-Ulm
Tinsmith work Josef Stahl GmbH, Neu-Ulm
Fixed ladders MUNK GmbH, Günzburg
Glass façade and windows Kräss GlasCon GmbH, Neu-Ulm
Gates and exterior doors BFB Pernes, Berghülen
Glass roofing atrium Kräss GlasCon GmbH, Neu-Ulm
Vestibule Kräss ClasCon GmbH, Neu-Ulm
Exterior plaster Hampel GmbH, Elchingen
Paving work Markus Brugger KG, Vöhringen
Gardening and landscaping Contract award not yet finalised

Technical trades
Heating and sanitary installations Josef Stahl GmbH, Neu-Ulm
Electrical installations Reimer Elektrotechnik GmbH & Co KG, Neu-Ulm
Refrigeration technology KKI GmbH & Co KG, Buch
Ventilation technology Heizbär & Eisbär GmbH, Buch
Lift Hydraulic Lift Systems Walter Mayer GmbH, Bruchsal
Integrated lifting platforms Willecke Hebe- und Fördergeräte GmbH, Hattingen

Would you like to find out more about our team?

We introduce all paulimot employees on our team page. Take a look and get to know us better.

To the "Team paulimot"

Would you like more information about paulimot?

Then sign up for our newsletter! Exciting news is waiting for you.

To the registration